Tampa Bay Water Wise’s controller offer starts with current prequalification. It is not a reimbursement promise for equipment you independently buy first. The program describes potentially free installation of a qualifying irrigation controller and says eligibility is evaluated periodically. Controller program

Confirm the property and water account first

The program lists existing potable-water customers of Tampa, St. Petersburg, New Port Richey, Pinellas County, Pasco County and Hillsborough County. Its property requirements are a single-family detached home at least two years old, with an automatic in-ground sprinkler system using potable water. The program must identify the landscape as over-watered; high consumption alone is not approval. A home in one of these counties is not automatically served by an eligible utility. General requirements

Compare consumption with sprinkler condition

Before buying hardware or scheduling changes, assemble:

InputWhy the program needs a precise answer
Water supplyThe published use screen concerns potable water, not reclaimed irrigation water.
Consumption historyThe page describes eligible customers using about 18,000 gallons or more per month on average, not one unusually large bill.
Existing sprinkler conditionThe system must already be in good working order.

Then use the program’s current prequalification route. Last year’s answer, a neighbor’s installation or a high summer bill does not settle this year’s eligibility. Keep the dated result and ask the program which step follows before committing to a purchase. Prequalification instructions

The installation handoff

After current prequalification and any needed sprinkler repairs, use the installer designated by the program’s current page. Its instructions call for a completed Customer Partnership Agreement and Sprinkler System Evaluation to give the installer. You must be present for installation and sign the General Release supplied at the visit. County Florida-Friendly Landscaping agents can help check the system, but the page explicitly says they do not perform repairs. Preparation and documentation

The same page includes generic customer-agreement language about rebate checks and purchases made within the preceding year. That wording does not establish that independently bought equipment qualifies for the advertised free-install route. Confirm which offer and terms apply before buying or hiring someone; keep the program’s response with the application.

Do not confuse equipment with the landscape award

Tampa Bay Water also runs a Community Water Wise landscape awards program. Its 2026 announcement gave a July 31 application deadline and described recognition and a custom steppingstone. It did not offer a general payment for replacing a lawn. 2026 awards announcement

Keep the program name in your project notes so that an award page cannot accidentally become the basis of a contractor’s rebate assumption.

A smart controller also does not override watering restrictions. The controller program expressly requires adherence to local restrictions. Ask about the actual installation, settings and owner responsibilities; neither this guide nor a prequalification result establishes a household’s water savings or a blanket right to irrigate.

Sources and method

LSL read the controller page’s eligibility, installation, documentation and customer-agreement sections and the April 1, 2026 awards announcement on September 21, 2026. The comparison separates the free-install handoff from generic rebate wording and the now-expired July 31 awards deadline. No application, installer availability, household savings, site condition or individual eligibility was verified.