The $376,088.36 in Mississippi’s June 9, 2026 I-20 at Halls Ferry Road action is a ceiling on a design work assignment, not the price of building the project. Item 5 authorizes geotechnical investigation, final right-of-way plans and final construction plans for a Warren County project. Approved June 9 agenda

Reading the assignment

Field in item 5What it identifies
LocationI-20 at Halls Ferry Road, Warren County
ProjectSTBG-0020-01(295)/100367-109100
Work assignmentNS-RWD 2023-15 under a roadway-design master contract
Authorized scopeGeotechnical investigation; Phase A final right-of-way plans; Phase B final construction plans
AmountNot to exceed $376,088.36 for that assignment

The word “final” qualifies the plans. It does not report completed construction. Likewise, a right-of-way plan is not evidence that a particular owner’s property has been acquired.

Use the project number, not just “I-20 work”

This assignment is different from the Warren County I-20 overlay and bridge-repair records numbered 109482 and 109684 in the current proposed schedule. Our separate overlay/bridge comparison explains those scopes. A shared interstate does not make their budgets or dates interchangeable.

When seeking a later Halls Ferry decision through the Commission records, include 100367-109100 and NS-RWD 2023-15. Ask whether the response concerns this design assignment or a later construction-phase record. That distinction prevents an unrelated I-20 contract from being mistaken for the Halls Ferry project.

Record scope

LSL reread item 5 and checked the Commission’s public record route on September 13, 2026. This is an explanation of the June authorization, not a claim that its deliverables remain unfinished or that no later action exists. We have not established a Halls Ferry construction award, work-start date, lane closure or parcel-level impact from this item.