An “Orlando, FL” mailing address is not a permitting jurisdiction. The City warns that the property may instead lie in unincorporated Orange County or another municipality. Check the address before choosing a permit portal. City address check

Temporary City outage: Orlando announces that permitting, planning and code-enforcement systems will be unavailable from September 23, 2026 at 2 p.m. through September 28 at 8 a.m. This is a City notice, not an Orange County Fast Track closure. Recheck the notice before a time-sensitive submission. City permit overview

Establish the jurisdiction, then select the system

Start with the City’s linked information locator. If it does not establish City jurisdiction, check the property’s municipality through the property appraiser and the responsible office. Do not treat “not Orlando” as automatically meaning “unincorporated County.” Orange County’s annexation page recommends the property record for certainty; recent annexation can change the answer. County jurisdiction explanation

Retain the address, parcel identifier, result date and the office that resolves any disagreement. These are the minimum useful inputs for a jurisdiction question—not proof of which permits every part of the project requires.

TaskInside City of OrlandoUnincorporated Orange County
Initial applicationCity application for the project typeFast Track application for the project type
Plan submissionProjectDox invitation after application processingFast Track electronic submittal
Responding to reviewFollow the City review instructions; its residential guide requires a narrative and identified drawing changesUse the emailed consolidated comments and Fast Track corrections route
Changing already approved plansCity overview directs a narrative email requesting that the digital portal be reopenedCounty FAQ says corrections and revisions must be uploaded, not emailed
Finding statusCity Permit Lookup, including related permitsFast Track permit, address or parcel search
Obtaining the appropriate completion certificateCity overview gives a permit-number email requestCounty FAQ gives the Building Records request route

This is LSL’s channel comparison, not a claim that every project needs identical documents. The City residential requirements, County One-Stop guide and Building Safety FAQ remain the project-specific starting points.

“Final issuance” does not mean the work is final

The County guide says an application moves to final issuance after the reviewing departments approve it. It then describes pre-issuance processing, fees and permit issuance. That phrase belongs to the application process; it is not the passed final inspection required for completion.

When a status looks favorable, identify what it describes: a plan review, an issuance task, an inspection or the permit as a whole. Match related trade permits as well as the main building permit. The City and County describe separate applicable trade permits; a main-permit result does not silently answer every connected trade question.

Both authorities publish Notice of Commencement instructions. The City’s general residential page and the County’s guide describe different levels of project-specific detail, including a County mechanical-work distinction. That difference in webpage coverage is not proof that Florida lien law changes at the City boundary.

Ask about the actual contract, scope and permit relationship, then use the responsible authority’s recording/submission instructions. The earlier version overemphasized the differing webpage thresholds as a jurisdictional contrast; this guide now confines its comparison to the verified systems and document channels.

For questions about contractor identity, use the separate contractor-record guide. For claimed permit exemptions, consult the City’s residential exemption guide and confirm the actual jurisdiction before applying it.

LSL compared the six operative City and County sources on September 21, 2026. We did not enter a private address, submit plans, calculate a fee or determine a legal notice obligation. The matrix covers City Orlando and unincorporated Orange County, not every municipality or separate utility, fire, historic or right-of-way authority.